WELCOME TO OUR WEBSITE
Innovative sampling solutions for Grade control
New Solutions To Old Problems
No extra personnel needed for sampling
StratiSampler ™ World's smallest automatic sampler
Correct data
Correct data As hole drilling by-product!
Enormous Quantities
Enormous quantities of waste rocks are being processed
Enormous Potential
Enormous potential to reduce waste rock dilution in majority of the mines globally
BHP Billiton’s Escondida Copper Mine, Chile
“…we estimate it is costing us around US$50.000 for each individual blast hole that is incorrectly sampled…”
Customer Benefit
Increase in sampling accuracy
Increase in analyzed data accuracy
Increase in blast planing quality
Increase in ore amount in process
Decrease in waste rock processing costs
Decrease in tailings
Easy to use & Works in any production drill
Increase in mine economy
WASTE ROCK PROCESSING IS VERY EXPENSIVE
Conventieonal method | 30 | % WASTE | Using StratiSampler ™ | 20 | % WASTE |
Annual ore production | 500000 | ton | Annual ore production | 500000 | ton |
Processing cost + transport | 20 | € / ton | Processing cost + transport | 20 | € / ton |
TOTAL processing cost | 10 | M€/ a | TOTAL processing cost | 10 | M€/ a |
Waste rock dilution | 30 | % | Waste rock dilution | 20 | % |
Waste Rock | 150 000 | ton | Waste Rock | 100 000 | ton |
Waste Rock (to process) | 150 000 | ton | Waste Rock (to process) | 100 000 | ton |
Waste Rock processing cost | 3 | M€ | Waste Rock processing cost | 2 | M€ |
ANNUAL SAVINGS | 0 | € | ANNUAL SAVINGS | 1000000 | € |
(Direct savings) | (Direct savings) |